Table 1. Reportable Pipeline Occurrences, October 2025

 

October

Year to date (October)

 

2025

2024

2020-2024 average

2025

2024

2020-2024 average

Total number of occurrences5108505765
Total number of occurrences with product release422181017
Total number of serious injuries000000
Total number of fatalities000000
Accidents000011
Product released000011
Release of hydrocarbon gas000011
Release of HVP hydrocarbons1000000
Release of LVP hydrocarbons2, 3000000
Release of other product000000
Release from line pipe body000011
Fire/Ignition000010
Explosion000010
Rupture000011
Pipeline contacted by object000000
Operation beyond limits000000
Geotechnical/Hydrotechnical/Environmental activity000000
Incidents5107505664
Product released42218917
Release of hydrocarbon gas30116410
Release of HVP hydrocarbons1000000
Release of LVP hydrocarbons2, 3100234
Release of other product021022
Release from line pipe body121334
Fire/Ignition001255
Explosion000322
Pipeline contacted by object211111011
Operation beyond limits011295
Geotechnical/Hydrotechnical/Environmental activity043121819
Unauthorized 3rd-party activity affects pipeline structural integrity021236

Data extracted 17 November 2025

NOTES:

1 HVP means high vapour pressure as defined in Canadian Standards Association Standard Z662.
2 LVP means low vapour pressure as defined in Canadian Standards Association Standard Z662.
3 As of July 2014, the minimum reporting threshold for releases of low vapour pressure hydrocarbons was established at 1.5m3.